Dorey Design Group
About Dorey Design Group
Businesses looking for a reliable technology partner often consider Dorey Design Group. Their core services include Mobile App Development. With 2 - 9 people on staff, Dorey Design Group can take on projects of varying size. Typical hourly rates run around $100 - $149/hr, with an average project cost near $100,000. Overall, Dorey Design Group is one of the options worth shortlisting for a technology project.
Last updated May 13, 2026
Services
Industries Served
Dorey Design Group Reviews
Data platform that turned five years of siloed records into a unified analytical asset
Project summary: Cross-agency data sharing had been blocked by incompatible systems for four years. A secure integration platform was the prerequisite for every transformation initiative in our roadmap.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Single source of truth delivered — if you know how rare that is, you understand why we are impressed
Project summary: A content deal had given us the rights to a major catalogue but our delivery infrastructure could not stream it reliably at scale. We needed a cloud-native video platform in under six months.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Outsourced IT that improved both the outcome and the cost line simultaneously
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Sensor network and analytics layer built by engineers who understood both halves equally
Project summary: Track-and-trace capability had gone from a differentiator to a table-stakes requirement and our platform had neither. We needed to close the gap before our next enterprise tender cycle.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Mixed reality build that landed exactly where the brief pointed and then went further
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
FAQs
What kind of software work does Dorey Design Group take on?
What should I expect to pay to work with Dorey Design Group?
What's actually in Dorey Design Group's technical toolkit?
What should I actually be looking at when comparing a company like Dorey Design Group to others?
Can I just hire developers from Dorey Design Group to sit alongside my own team?
Will Dorey Design Group sign an NDA before we even discuss the project in detail?
Does Dorey Design Group only work locally, or take on clients elsewhere too?
Can Dorey Design Group take on an old, outdated system rather than starting from scratch?
What does Dorey Design Group's actual delivery process look like week to week?
How do I actually get a real proposal out of Dorey Design Group instead of a generic reply?
Worked With Dorey Design Group?
Rate your experience
Write a Review