An extensive experience of successful work with world-class companies, independent ratings, recommendations and reviews of reputable companies confirm their high level of professionalism. For applications assessment, we use only detailed costing system, which provides a fair price of the product and determines the fair timeliness of project delivery.
Last updated May 13, 2026
Services
Industries Served
SKY INCOM Reviews
Write a ReviewPenetration test that found things our previous vendor had missed for two consecutive years
Yuki Hashimoto / Head of Product Development - East Asia Commerce KKMar 16, 2026
Project summary: Integration between our clinic management system and our patient-facing app had been a recurring failure point. We needed an engineering partner who could own the integration layer end to end.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
IoT architecture that scaled from pilot to full fleet without a single redesign
Clémentine Aubert / Head of Digital Products - Arc-en-Ciel Digital SASMar 10, 2026
Project summary: The transition to EV had created demand for dealer network management capabilities our existing system was not designed to support. A targeted rebuild was the agreed path forward.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Machine learning in production that the board could see working within eight weeks
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdFeb 09, 2026
Project summary: Grid modernisation funding required us to demonstrate demand-response capability. The machine learning models existed on paper; we needed an engineering partner to build and productionise them.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons